COST ESTIMATION AND TAKEOFF

 Construction Estimates are the backbone of your contracting business and we specialize in it. Cost estimation is used to bid the project and to predict the quantity, and cost of the resources required by the scope of a project. An accurate estimate serves as the roadmap for a project to be designed, bid and built in a cost-efficient manner.

Estimating is done by breaking down the total scope of a project in various CSI divisions, to which resources can be assigned and cost. There are standardized ways of breaking down a project, like the CSI divisions, but depending on the needs of the project team and external parties multiple structures are often implemented to align reporting and sharing of cost data. Our approach is built upon the rigorous guidelines set forth by the American Association of Cost Engineers (AACE).

Many of our clients engage us during the planning phase, and we remain involved throughout all phases of design and pre-construction: including designing, estimating and scheduling.

We cover all types of projects: including residential, commercial, remodel and Industrial all across the states and Canada.

Cost-Estimating

Our Cost Estimation services include

Quantity Take-off
Full GC Cost Estimate
Preliminary cost estimates
Material Take-off
Subs Estimate
Ballpark Estimates
Labor Take-off
Design Estimates

We provide our services to anyone looking for it. Home Builders, Architects, General Contractors, Sub-contractors, Developers, Design-Build Firms, Suppliers, Realtors and Property Owners, are most common to consider our construction estimating services.

We work according to CSI Divisions and cover all of them.

    Division 02 — Existing Conditions

    Division 03 — Concrete

    Division 04 — Masonry

    Division 05 — Metals

    Division 06 — Wood, Plastics, and Composites

    Division 07 — Thermal and Moisture Protection

    Division 08 — Openings

    Division 09 — Finishes

    Division 10 — Specialties

    Division 11 — Equipment

    Division 12 — Furnishings

    Division 13 — Special Construction

    Division 14 — Conveying Equipment

    Division 21 — Fire Suppression

    Division 22 — Plumbing

    Division 23 — Heating Ventilating and Air Conditioning

    Division 25 — Integrated Automation

    Division 26 — Electrical

    Division 27 — Communications

    Division 28 — Electronic Safety and Security

    Division 31 — Earthwork

    Division 32 — Exterior Improvements

pexels-photo-2219024
pexels-photo-13330815

Too many contractors underestimate the cost a project will take.
They tend to do this for two reasons: one is that they want to show the client they can complete the project in less time than others and the other is that they are trying to be the lowest bid to secure more work, and find out too late that the project cost is way more than what was estimated.
This can be disastrous to your business. Don’t make that mistake!